The world’s largest thin-film solar cell components of R & D companies – the United States FirstSolar (first solar energy company), will be in the Ordos City Hangjinqi photovoltaic power generation projects in construction, power generation capacity will reach 2G-watt (2000 MW).
According to a memorandum of understanding signed by both parties, both wind turbines sides will cooperate in the Ordos City, in the construction of a Hangjinqi has 2G-watt generating capacity of solar photovoltaic power plants. Project construction will be wind generators completed in four phases, the first phase of the start time is June 1, 2010, power generation, will be the size of 0.03G watts (30 MW); 2, 3 will be completed in 2014, the scale for the 0.1G W (100 MW) and 0.87G watts (870 MW), followed by the four project completion scheduled for 2019, the size of 1G W (1000 MW). The project area will reach 64 square kilometers, with an china wind turbines expected total investment of 4 billion to 6 billion yuan. Than the size of the station now operates the world’s largest photovoltaic power plant large 30 times. Is by far the world’s largest human use of solar energy projects.