By the China CSR Zhuzhou plateau provided WT1500/D82/H65 type wind turbines to the grid first batch debugging success. Up to now, the company has received total orders for high-altitude turbines more than 400 markets in high-altitude wind power markets have occupied the domestic share of the first.

WT1500 small wind turbine type is the Plateau of China South Locomotive WT1650 wind turbine in its autonomous operation model based on the volume to overcome the high altitude high altitude, wind conditions, complex, varied terrain, air density and low adverse factors, the wind turbine generator to a large number of optimized and specially designed a new type of wind turbine. The unit uses a new type of protective system, and enhance the fan’s anti-UV, anti-icing capability, cooling fan, cooling and lightning, moisture capacity are optimized, design a new cooling fan cooling system and lightning protection systems ; same time, the model completely tailored for high-altitude, high altitude environment remains a superior low voltage across the function, control and electrical performance, fully meet the power requirements of the machine.

After five years of development, China South Locomotive and already has 1.5 MW of high-altitude wind turbine, a full range of 1.65 MW wind turbine, 2.5 MW coastal / inland wind turbine and other products, from the northeast region of the wave saline between the belt and northwest wind to 30 ℃ degree low-temperature environment of negative wind farms, to the mountain farm in southern China, to Yunnan, Guizhou, Tibet’s high altitude wind power, China South Locomotive and wind turbines can be adapted to meet the different wind environment, climate conditions and custom requirements.

China’s high-altitude wind energy is abundant, high-altitude wind turbine market is huge fan of the high altitude areas most needed concentrated in the northwest and southwest regions. According to related statistics, only in Qinghai and Yunnan Plateau fan of market capacity to more than 13 million kilowatts, the China South Locomotive and total installed capacity of wind farm installed capacity of 49,500 kilowatts, is expected to wind power generation capacity of 161.55 million kilowatts when the line capacity up to 122,780,000 kwh or more.

With 42.3 GW of wind power installed, China has now become the new world leader in wind power, having overtaken the US, with 40.2 GW, which itself bypassed the longtime world leader Germany in 2008.

After four years of doubling its installed wind power generator capacity annually between 2006 and 2009, China added a record 16.5 GW in 2010. According to a detailed report(pdf) from the Netherlands Environmental Assessment Agency, nearly 20 percent of all net additional power generation capacity in China is now wind power, nearly on par with its hydro. China now leads the world in large-scale hydropower with 21 percent of global production.

Hydropower output increased by 5.3 percent in 2010 with China wind turbines accounting for more than half of the growth, due to an increase in capacity and favourable (wet) weather in 2010. As the climate heats up causing wilder wetter storms, hydropower could supply more energy in regions that are due for increased precipitation under a warming scenario, such as the Pacific Northwest, which has recently had to shut down other sources as storms so much increased hydropower production.

US wind installations dropped to half the rate of 2009, when the Obama administration Recovery Act provided a onetime boost. With the return of a much more fossil-friendly House, policies that help grow renewable power have been halted once again. September 30th saw the last of the DOE’s successful loan guarantee program, as Republicans, who dispute scientists on climate change, and have no problem with pollution, oppose supporting renewable energy.

1. rated power 3000w

2. max power 4500w

3. battery bank voltage 180v

4. yaw shaft with the power supply and gearbox inside, controlling the operation of wind generator

5. nose cone made of reinforced aluminum alloy, antisepsis casting

6. wind vane and anemometer indicating wind direction and measuring wind speed. transmitting wind signal to PLC controller.

7. tower made of galvanised steel , salt and acid proof, UV-proof.

8. off grid inverter integrating the functions of battery charging, inverting, and controlling, a spare terminal of solar panel on the back.

9. grid tied inverter adopting MPPT and IGBT technologies, with high power generating capacity, wide AC voltage range.

10. Siemens PLC controller receiving windsignal and operation signal, quick response and reaction, reliable and intelligent control.

11. hydraulic brake: brake block assembled in the flange of wind generator for hydraulic braking.

12. rectifier, dumping load, inverter seperately equipped.

H4.6-3000w wind turbines

China’s wind power installed capacity from the end of last year’s 44.73 million kilowatts, respectively, to 200 million, 400 million and 10 million kilowatts. From 2011 to 2050, wind power generators development brings total investment will reach 12 trillion yuan.
This report by the National Energy Research Institute and the International Energy Agency, United Nations agencies last year and a half on a report prepared for the first time China’s wind power development based on the actual situation and future prospects of the development trend of setting goals, and analyze the goals of resources, technology, industry, policy and other aspects of the existing conditions and wind turbines future direction. Energy Research Institute National Development and Reform Commission Han Wenke, director, said, “China’s wind power development roadmap for 2050″ is a forecast and conceived, is not equivalent to government introduced the industry development plan, but for countries to develop long-term development planning some reference and help.
It is understood that China’s renewable energy “second five” development planning and long-term development plan for the work has entered the final stage. There were indications that the plan set an initial target of China’s wind power development are: 2015, domestic wind power installed capacity will reach 100 million kilowatts by 2020 will reach 200 million kilowatts.
2011 Beijing International Wind Energy Conference and Exhibition on the release of “Chinese wind power development roadmap for 2050,” predicts that by 2050, China’s small wind turbines installed capacity will reach 10 million kilowatts, after the thermal power installed capacity, about 26 in the power structure %, for the country to provide 17% of the electricity. The next 40 years, the domestic wind power development will bring the total investment reached 12.096 trillion yuan, bringing jobs to reach 7.2 million.

Norwegian companies take to Beijing for the most influential event on wind power generators in China this October.
With more than 600 exhibitors and an expected 40 000 domestic and international visitors to the exhibition, the stage is set for what has become Asia’s largest wind power event. Covering a total exhibiting space of 120 000 square meters, the three day exhibition and concurrent conference attract the major players of the Chinese wind industry. China Wind Power 2011 is jointly organized by China Renewable Energy Industry Association, China Wind Energy Association and the Global Wind Energy Council.
At the Norwegian Pavilion visitors will have the chance to meet with the four Norwegian companies Windsea, ChapDrive, Norsetek and Vestavind Offshore. With their competence ranging from unique wind turbine solutions to floating structures for offshore wind turbines, all the companies have had a persistent commitment to the Chinese wind power industry. Representatives from the Consulate General Guangzhou and Innovation Norway, who have worked closely with several Norwegian companies and their entry into the Chinese wind power industry, will also be present. In addition several other Norwegian companies are participating with separate company pavilions.
China Wind Power 2011 takes place 19-21 October at the New China International Exhibition Center in Beijing.

When compared to the 18.92GW installed in 2010, the figures confirm China’s wind energy growth is continuing to slow.
China’s wind turbine installed capacity has experienced a rapid growth during 2007-2010, with newly added capacity of 3.31GW, 6.15GW, 13.8GW and 18.92GW each year, respectively.

However, a year-on-year increase of 38% in 2010 signaled a slowdown compared to the 100%+ increase in the previous three years.

In August, China wind turbines earmarked a quota of 28.83GW installed capacity across the country, as the first batch for the 12th Five Year Plan period 2011-2015.

China is expected to have 90GW wind installed capacity by 2015, compared with 44.73GW in 2010.

NEB has set stricter access rules and higher national technology standards for wind-power access to power grid earlier this year.

In addition, wind-farm projects with a capacity less than 50MW must apply to NEB instead of getting approval from local governments. This has delayed or suspended construction of some wind farms in the second quarter this year.

off and on grid Hummer H8.0-10000W Wind Turbines

Featurers:

Small

& light structure ,the wind  generator is installed inside the nose cone

which can help for heat dispersion and reduce the wind resistance .

Blades designed according structure and aircraft technology

Generator built with permanent magnetic materials which have 4 patented technologies

Advanced controlling system ,can be connected to the local grid directly or for off-grid usage .

Special anti-corrosion treatment of the parts

Specification and performance of H8.0-10000W :

Rated power(W) 10000
Maximum output powerW 15000
Charging voltage (V) DC 240
Blade quantity 3
Rotor blade material GRP
Rotor blade diameterm 8.0
Start-up wind speed (m/s) 3.0
Rated wind speed (m/s) 10.0
Rated rotating rate (r/min) 200
Wind energy utilizing ratio (Cp) 0.4
Generator output Single-phase

frequency conversion AC

Rated charging current (A) 41.7
The maximum charging current (in a short time )(A) 65
Output AC frequency (Hz) 0~280
Generator efficiency >0.8
Free standing tower diameter(mm) 900*630*15000 (2pcs)
Guy tower diameter(mm) 1050*750 *16000(2pcs)
Tower height(m) 15
The weight of generator(kg) 287
Battery 12V 600Ah/800Ah 20pcs

Application of Model H3.8-2000W small wind turbine

It can drive air-condition (2 horsepower), pump or other electrical appliances (≤2KW).

Well used in:

Housing

Telecommunications Station

TV Transfer Station

Monitoring Station (military, hydrology, observatory)

Water-pumping Station

Main technical data

Rated power (W) 2000
Maximum output power (W) 3200
Charging voltage (V) DC 120
Blade quantity 3
Rotor blade material GRP
Rotor blade diameter (ft.) 12  (3.8m)
Start-up wind speed (mph) 7    (3.0m/s)
Rated wind speed (mph) 20  (9.0m/s)
Rated rotating rate (r/min) 450
Wind energy utilizing ratio (Cp) 0.45
Generator output Frequency conversion AC
Rated charging current (A) 16.7
The maximum charging current (in a short time )(A) 28
Output AC frequency (Hz) 0~370
Generator efficiency >0.8
Tower diameter (in.) ø4.5*78.7*0.2 (ø114*2000*4 mm) (5pcs)
Tower height (ft.) 33  (10m)
The weight of generator (lb) 55  (25kg)
Suggested Battery (Ah) 150/200

Recently, the Spanish company Gamesa wind energy development with China Huadian Group signed a new agreement, plans to Inner Mongolia, China in 2011-2012 in the total installed power of 200 MW of wind turbines. So far, Gamesa has become China’s major wind turbines manufacturers, and with the cooperation of China’s major power companies to build wind parks, the company has 60 in various regions of inland China about 3,000 turbines installed in Tianjin and Jilin 6 family tradition established plants in China, the total installed capacity of 2900 MW. June 2011, China’s foreign fans Zhangaigongsi 20% of total sales.

The end of September, the first wind farm in Guangxi will be officially put into operation. The wind farm construction in gold purple mountains of Guilin county resources, with a total installed capacity of 33 sets of 1500 kilowatts. Guangxi Power Grid Corporation has sent technicians to the electric field of technical support.

Recently, Guilin Power Supply Bureau of gold resources and technical personnel to Purple Mountain Wind Farm, part of its step-up station 110 kV network equipment examination, and electrical projects inside the test equipment and measuring devices to give technical support and debugging.
110 kV Transmission Line Project’s construction schedule, the construction period, construction difficult circumstances, Guilin Power Supply Bureau and the Participation elaborate arrangements for the construction and construction inspection unit. Next, the council will also take active measures, in the scientific plan to accelerate the construction of power grids at the same time, efforts to improve system stability, wind power development for the escort.

Gold Purple Wind Power Project by the South Branch of China Power Investment Group invested a total investment of 1.5 billion. County wind farm located in the resource field melon in Hmong village and town car the border, started construction in 2009. Project in three phases, the average single wind turbines generating capacity is about 2.9 million kilowatts, with a total installed base of 100 units with a total installed capacity of 150,000 kilowatts, the equivalent of the resources the county’s electricity consumption. The first phase of the total installed capacity of 49.5 MW will be installed 33 sets of 1500 kW small  wind turbines, put into operation network will greatly ease the power shortage situation in Guilin area.