Xiangyin County Magistrate Li Zuofeng rate of development and reform, investment head to Beijing, and the United States UPC Renewable Energy Group (China) executives to discuss the introduction of green windpower generator projects. Renewable Energy Group, United States UPC is the world’s most successful to wind-based renewable energy development and investment company, has a very rich development, financing, construction and operation experience and solid financial strength, in the United States, Europe, Asia investment company set up a project development in 2006, officially wind turbines entering the country, in Liaoning, Jilin and other provinces are developing 17 projects, total investment reached 45 billion yuan.
Qingshan island of 12 square kilometers Xiangyin County, surrounded by water, tested by experts, and 70 meters high average wind speed is 5.35m / s, 100 meters above the height of the average wind speed of 6.0m / s or so. To the main north-south wind direction, to adapt to the modern fan power requirements, with the development of value, UPC this promising company. Lizuo Feng came to Beijing, and the UPC Renewable Energy Group (China) president of in-depth discussion, and to develop a preliminary cooperation agreement. Castle Peak Island wind power project preliminary estimate of the total capacity of 50 MW, a total investment of 500 million yuan. Expected to be formally signed early in September, into the wind generators tower construction, and workers may stage.
Xiangyin or the introduction of wind turbines projects
Tags: wind turbines
Sorry, the comment form is closed at this time.