In order to guide wind power equipment manufacturing industry and healthy development of wind power equipment to prevent the blind expansion of production capacity, and encourage superior enterprises bigger and stronger, optimize the industrial structure, standardize the market order, China’s wind power equipment manufacturing industry will be developed into an internationally competitive new industry , according to state laws and regulations and industrial policies, is formulated entry criteria.
This entry is applicable to the production of grid-connected wind turbine generator (hereinafter referred to as wind turbine) and wind power equipment companies.
First, the establishment of manufacturing enterprises
(A) the establishment of wind turbine manufacturers to comply with the state’s industrial policy and wind power equipment manufacturing industry development planning, project investment, the proportion of own funds shall not be less than 30%.
(B) wind turbine manufacturers must have the production capacity of 2.5 MW and above, stand-alone, annual production of 1 million kilowatts more than the necessary conditions of production and all production facilities.
(C) wind turbine manufacturing enterprises in transformation and expansion should have accumulated less than 50 kilowatts of installed performance.
(D) new wind turbine manufacturer shall have five years experience of large-scale mechanical and electrical industry practitioners.
(E) To facilitate the long large transport, wind turbine manufacturers site should be chosen at a convenient transportation areas.
(Vi) wind generators manufacturers and wind turbine should be based on supporting enterprises to establish a complete industrial chain of the principles of layout.
2, process equipment and R & D Testing
(A) wind turbine generators manufacturing enterprises should establish a professional R & D team, professional cover aerodynamics, structural analysis, mechanical, hydraulic, electrical, automation, software development and other fields.
(B) wind turbine manufacturing enterprises should have a wind turbine machine design and development of technology, with wind turbine machine design and development software, the corresponding supplementary means.
(C) wind turbine manufacturer should have the gear box, generator, inverter and other supporting yaw devices and key parts to the factory inspection test conditions and capabilities.
(D) wind turbine manufacturers must have the inverter tests, electric control system tests and full power test machine such as factory test conditions and capabilities.
(E) wind turbine equipment manufacturing enterprises should be measuring the relevant departments of qualified approval.
3, product quality and after-sales service
(A) wind turbine manufacturing enterprises should establish a sound quality management system, and through qualified with a recognized certification body.
Enterprises should in the production of the whole process of the implementation of strict quality management, for supporting the key wind turbine components such as wheels, blades, gear boxes, generators, converters, control systems, variable propeller systems, tower, brake systems, etc. enterprises should be established for spare parts and spare parts and raw materials quality control system.
(B) wind turbine manufacturer products shall meet the “wind power technology standards” on wind turbine performance requirements.
(C) wind turbine manufacturing enterprises should set up a complete product supply chain and supporting after-sales service system to ensure that product performance and quality.
(D) wind turbine manufacturing enterprises in transformation and expansion, should have the 200 MW-class wind turbine wind farm through 240 hours of pre-acceptance conditions.
Fourth, technological progress
(A) strictly limit the wind turbine manufacturer to introduce the following single-machine capacity of 2.5 MW wind turbine machine technology or purchase of production licenses.
(B) The production of wind turbine manufacturers wind turbine blade speed should be changed and other advanced technologies and processes, and similar products with international standards.
(C) wind turbine manufacturing enterprises with independent intellectual property rights should give priority to the development of stand-alone capacity of 2.5 MW and above, wind turbine industrialization; give priority to the development of offshore wind turbine industrialization.
(D) wind turbine manufacturing enterprises should increase investment in product development, research and funding into the proportion of sales revenue accounted for less than 5%.
(E) wind turbine manufacturing enterprises should strengthen personnel training and the reserves to build platform for technological innovation to enhance capability of independent innovation.
5, energy saving and environmental protection and comprehensive utilization of resources
(A) wind turbine manufacturers new or renovation and expansion of wind power production project, it shall strictly implement the “Environmental Impact Assessment Law,” by law to have the power to approve the environmental protection administrative department for approval of environmental impact assessment document. In accordance with Environmental Protection “three simultaneous” requirement in building the project relative to supporting environmental protection facilities, according to environmental acceptance of completed applications.
(B) wind turbine manufacturers wind turbine manufactured product energy efficiency indicators, noise indicators should be limits to achieve the national and industry standards requirements.
(C) wind turbine manufacturer in the wind turbine should not be used during the manufacturing process of the backward countries have explicitly eliminated mechanical and electrical equipment shall not be used explicitly prohibiting the use of national production process, and shall not explicitly limit the use of national phase-out material.
(D) wind turbine manufacturing production water recycle rate should reach or exceed 90% of the production process of the solid waste recycling utilization rate should reach 85%.
6, security, production and labor and social security
(A) wind turbine manufacturing enterprises should abide by “Safety Production Law”, “Occupational Disease Prevention Law” and other laws and regulations, implementation of the national production safety standards or industry standards.
(B) wind turbine manufacturing enterprises should have the appropriate safety and occupational hazard control conditions, there should be a sound safety organization and management system, and employee safety training system, and production safety inspection system.
(C) wind turbine manufacturing enterprises should be in accordance with law to participate in old-age pension, unemployment, medical care, injury and other types of insurance and related insurance costs for employees paid.
7, supervision and management of
(A) The State Ministry of Industry and Information Technology in conjunction with the State Development and Reform Commission, the National Energy Board on a regular basis notice consistent with this access standard “wind turbine manufacturers list of qualified vendors,” China’s wind power industry regularly publish relevant information to guide enterprises to and social investment and product technology development.
(B) the existing wind turbine manufacturers do not meet the entry standards, access standards should be enacted in this within six months after the rectification, the rectification not meet the standard entry requirements, shall not be eligible countries in investment, taxation, land, environmental protection, credit and other aspects of policy support, shall be included in the “wind turbine manufacturers list of qualified vendors.”
(C) wind turbine manufacturers new or renovation and expansion of environmental impact assessment report must be approved by the provincial level and above, the competent department of environmental protection administration for approval.
(D) do not meet the access standards of the wind turbine manufacturing enterprises, investment management department shall be approval, approval and record-related projects, financial institutions are not allowed to provide loans and other forms of credit support for, land management, urban planning and construction, environmental protection, fire protection, public health, safety supervision departments shall handle the relevant procedures.
(E) The provincial department in charge of local industry, Development and Reform Commission departments and the energy management department is responsible for this region “of wind power equipment manufacturing industry access standard” implementation of the supervision and inspection of the Ministry of Industry and Information Technology, the National Development and Reform Commission and the National Energy Board responsible for the local “access for wind power equipment manufacturing industry standard” implementation of the supervision and inspection.
(Vi) the relevant industry associations, standardization and certification bodies should strengthen domestic and international wind turbine market, wind turbine technology development and introduction of technical analysis research and promotion of wind turbine industry, environmental protection, energy saving and comprehensive utilization of resources of new technologies; strengthening the standard system; the establishment of access standards in line with the evaluation system, scientific and fair assessments of the views; to assist the relevant government departments do a good job monitoring and management.
VIII Supplementary Provisions
(A) The access standards by the State Ministry of Industry and Information Technology, the National Development and Reform Commission and the National Energy Board responsible for the interpretation.
(B) The access standards come into effect from the day of release.

Malta will make every effort to try to build in a shallow reef wind farm. If this proves feasible, wind power, wind power can constitute the next clean energy in Malta, around 40%.

Period of time requested by the European Union by 2020, Malta must have a 20% energy production from renewable clean energy.

The wind-measuring pole stands 80 meters high, with 17 wind turbines blades, can be measured at different heights in all directions of wind and wind generators speed, the unit cost of 150,000 euros. Test Location Sikkal-Bajda Malta one of the most suitable for the establishment of large-scale wind farm shallow reef is expected to be installed 18 to 20 wind generators.

Pullicino said that in the two-year wind-measuring process, will also examine whether the wind power development would be a negative impact on ecological reef. In addition, the Malta Resources will also Bahrija and HalFar two smaller land-based wind measurement activities in a similar study the possibility of land-based wind farm construction.

Pullicino said that since Malta is basically surrounded by deep-sea, surrounded by shallow reefs wind power if it proves feasible, we have to wait for deep-sea or floating wind power generation more technically mature and economically more cost-effective before considering the development of deep-sea wind power.

As the closest to commercialization of new energy – wind power equipment manufacturers and wind farm construction and operation of investment in recent years, the focus of attention. As of the end of 2009, China’s wind power installed capacity of 20 million kilowatts super-consecutive 5 years to achieve 100% growth. In 2009 the total global wind power capacity reached 157.9 GW, compared with an increase of 37.5 megawatts last year, while there are nearly one-third of new capacity from China. Is expected to the end of 2010, China’s total installed capacity of wind power is expected to reach 30 million kilowatts.
But the prosperity and development of the situation is hidden under the worry: the rapid development of wind power industry to gradually prominent issues, but in many issues, and network lag is the most prominent of all players in the focus. Inner Mongolia Ulanqab the end of 2009 appeared in the event of the plight of wind power generator outside the transmission case, which led directly to 4.3 million kilowatts of clean wind TVU area of abandoning the wind does not contribute to power generation.
“In fact, as early as this issue had been highlighted the first half of 2009. Cause of this phenomenon is the direct cause exists in the wind power industry has not broken some key technical bottlenecks, power quality and instability in the security of the entire power grid caused by potential problems. At the same time, development Wind power industry in the region is lagging behind the design and construction also contributed to the bearing pressure of weak power grid.

Installed capacity of 4.5 million kilowatts, a total investment of about 518 million Datang four grid wind power project groundbreaking ceremony held on the first phase. Datang branch in Guangxi, Guizhou provincial Energy Board and other relevant departments as well as the Liupanshui municipal party committee and other departments attended the groundbreaking ceremony.

Datang four grid wind farm is located in Guizhou Province, Liupanshui Panxian four grid rural territory, the site slopes Prairie Township is located in a four-frame ranch. The wind farm installed capacity of 100,000 kilowatts preliminary planning, with a total investment of about 10 billion yuan, sub-2 development and construction. A project plan to install stand-alone capacity of 1500 kW wind turbine group of 30 Taiwan, the annual electricity consumption of about 74.19 million kwh Internet.

Datang 4 grid wind farm construction is not only Datang Power to enter the wind power development in Guizhou marks a milestone in the market, but also energy supply, Guizhou Province, an effective supplement. From the energy efficiency and emission reduction effectiveness analysis of four grid wind farm a project is finished, and power generation compared to thermal power plants of similar size, according to coal consumption of 350 grams of standard coal power / kWh meter, the annual savings for the state standard 24.5 thousand tons of coal, relative to the current increasingly serious energy crisis, wind power has a strong vitality, in line with national industrial policies. In addition, the project could reduce emissions of sulfur dioxide 490 tons per year, carbon monoxide, 7.84 tons, 85.8 tons of nitrogen oxides, carbon dioxide, 58.8 thousand tons, 0.34 tons of hydrocarbons, ash 5880 tons, annual savings of 266,000 cubic meters of fresh water.

Ping Lu Kaidi wind power projects a total investment of 1.5 billion yuan, planning capacity of 100MW, put into operation, the estimated annual electricity output of 1.0158 billion kWh, the annual output value of 140 million yuan, paid taxes 20 million yuan. A project investment 525 million yuan, an installed capacity of 49.3MW, is now officially completed, expected in May to the grid.
Tower built in fan cylinder height of 70 meters, 28 meters long monolithic fan, has built 22 wind turbines.

Recently, China’s own R & D production of 2-megawatt permanent magnet direct-drive type of wind power converter through the identification of Wuhan, in Hubei province. This result can completely replace the imported products, some of the indicators is superior to similar foreign products.
At present, China, been able to independently produce two-megawatt permanent magnet direct-drive generator sets, but with units supporting grid converter is entirely dependent on imports, severely constrained the domestic wind power industry. In 2007, Daqo Group and the Naval Engineering Technical University, Hunan Electric shares (Quote stock bar) Co., Ltd. a joint self-developed high-power permanent-magnet direct-drive wind turbines converter. After two years of hard research has finally developed. The converter is running high-performance, power density to meet the harsh operating environment, you can type with the corresponding permanent magnet direct drive wind turbine directly supporting and providing high-quality standard-frequency power supply. Results not only to meet the future of direct-drive type wind power generation applications, the demand can also be extended to ships, aircraft and other applications.

Wind turbine in the gear box is an important mechanical parts, whose main function is to round in the wind under the action of wind generated power passed to the generator and its corresponding speed. The wind speed is usually very low round, well short of the required generator speed, gear box gear pair must pass the role of the growth achieved, it will also be called the growth in box gear box. According to the general layout of unit requirements, sometimes with the wind wheel hub directly connected to the drive shaft (commonly known as the shaft) and the gear box together as one, there will be large shaft and gear box were arranged, during installation or the use of up tight coupling connected structure. In order to increase the braking capacity of units, often in the gear box input or output is set brakes, brake with the tip (scheduled for slurry from the wind wheel) or variable pulp away from the brake transmission co-unit of the joint brake.
As the unit installed in the high mountains, wilderness, beaches, islands and other draft Department, subject to erratic changes to the role of variable load and strong gusts of wind impact on perennial withstand heat and extreme cold temperature impact, combined with the natural environment in which transportation is inconvenient and gear box mounted on top of the tower’s narrow space, the event of a failure, repair is very difficult, so its reliability and service life have raised much higher than the average mechanical demands. For example, the requirements of the component materials, in addition to regular state mechanical properties, but also should have a low-temperature state, anti-cold brittleness and other characteristics; should ensure a smooth gear box, to prevent vibration and shock; to ensure adequate lubrication, and so on. Summer and winter temperature difference of a huge area, you want to configure the appropriate heating and cooling equipment. Would also like to set up monitoring points, on the status of remote control operation and lubrication.
Different types of wind turbines are not the same as the requirements of the arrangement of the gear box and a structure and therefore vary. Horizontal axis in the wind power sector, wind turbine with a fixed parallel shaft gears and planetary gear drive the most common.
As mentioned earlier, wind power generation by natural conditions, the impact of the emergence of some special meteorological conditions, all of which might lead to failure of wind turbine, while the small cabin is not like on the ground as the machine has a solid seat base, the entire transmission system of the power matching and torsional vibration of the factors that has always epitomized the weak link in a large number of facts show that the link is often in the gear box unit. Therefore, strengthening the study of the gear box and attach importance to their work of maintenance is particularly important. Section II of the design requirements must be designed to ensure that in meeting the reliability and life expectancy under the premise of the streamlined structure and the weight of the lightest. Should normally be used CAD optimized design, optimum transmission scheduling program, select a reasonable design parameters, choose a stable and reliable components and have good mechanical properties, as well as the environment remains stable under extreme temperature variations of the material, and so on.

hina’s wind power installed capacity of 20 million kilowatts super. Is expected that the end of 2010, China’s total installed capacity of wind power is expected to reach 30 million kilowatts. The rapid development of wind power industry, the rapid expansion of wind power generator investments, local development of wind power industry, the rising enthusiasm. However, this is where the problem can not be ignored, wind power equipment to more than 70% localization rate of the cancellation of the policy will be local development of wind power industry, what impact? The development of wind power industry, local governments are faced with what issues?
For the current local wind power industry development, You Yu-feng, deputy director of the CMC that: First, the wind power market, investors increased, increasing the integration of a modern park gathering. China’s wind power manufacturing enterprises only six from 2004 to 2009, the rapid development of more than 80. But more than half of China’s wind power manufacturers and international large-scale wind power manufacturers are concentrated in several large Chinese wind power industry base. The wind power base has become a major wind power equipment manufacturing firms are concentrated area, it is thanks to its good investment environment for development, such as the abundant wind resources, it is obvious location advantages, a strong industrial base, intensive scientific and technological resources , favorable policy environment. Second, the wind turbines market investment technical risk faced by investors increasingly cautious settled location. For instance, the supply of wind power parts, there is always a certain gap, such as main bearings, gear boxes, control systems and the core components converter almost all rely on imports. Therefore, at present many potential investment in China’s wind power plant industry giants will be in selecting the site area of the development of wind power parts and components industry as an important location factor.

In the fierce international competition, China’s wind generators technology and equipment has been a lack of core technology and independent intellectual property rights for China’s wind power technology and equipment development and the development of enterprises constitutes a serious constraint to enhance self-innovation capability is to enhance the international competitiveness of the fundamental way. It is only through science and technology and human resources elements of a comprehensive integration, substantial increase in ability to innovate in order to break through resources, energy and environmental constraints. As technology advances, the trend to accelerate product upgrading, new product development and technology upgrading and other hidden costs. At the same time as the introduction of relevant national industrial policies, to increase wind turbine generator product requirements, it will also result in transformation costs. Thus, the technology has become in many wind power industry, investors need to carefully weigh the factors.

It match with Hummer wind turbines special ALL-IN-ONE inverter system , which combine the functions of battery charger , controller and inverter . The inverter system offer a direct link with solar panels . It is featured by high level efficiency , compact size , out-standing power generation ability .

H3.1-1000W wind generator designed with dual protection , one is furling protection ,the other is manual stop button . When the wind blows too fast , the generator wil deflect driven by wind . H3.1-1000W wind generator’s tail pole is made of strong manganese steel , ensuring durability . In additional ,we also include a manual stop switch which can turn off the wind turbine by force . Through this dual protection , the system is safe and reliable .

Bo Corporation in Germany and Switzerland, Alvater today with the signing ceremony held in Weifang Zhongyun machines, an additional investment of 40 million euros wind turbine production. Bo Corporation in Germany and Switzerland, Alvater today with the signing ceremony held in Weifang Zhongyun machines, an additional investment of 40 million euros wind turbine production. Additional funds become available, the total investment will reach 1.6 billion yuan. This wind turbine uses Zhongyun company’s proprietary technology, intellectual property rights – permanent magnet direct-drive technology, power generation more efficient than similar models with the industry increased 46%. All operational, will become the backbone of wind turbine manufacturers.

Page 1 of 212