China’s first 3000 kilowatts wind turbines installed on the Taiwan Strait

admin @ 2010年01月17日 7:20 am | Comments Off

Tags:

China’s first 3000 kilowatts wind turbines installation has a successful conclusion. The project is domestic, as well as Asia’s first large-scale offshore wind farm, but also the State Development and Reform Commission identified the first wind farm demonstration projects. The East China Sea Bridge wind farm is located in the east of Shanghai Donghai Bridge, 1000 meters away from the waters (from the Nanhui Zui 8-13 km). 3000 kilowatts wind generators tower height is 80 meters, 92 meters in diameter impeller swing, machine weighs 450 tons, in reference to domestic and international fan installation installed instance, determine the fan the whole assembly, the overall maritime transport and offshore installation of the whole The overall construction technology programs.

Related Articals


Font: Large   Normal   Small

Sorry, the comment form is closed at this time.