Laizhou City, completed a total of wind turbines generating capacity 5938.868 kwh, the highest capacity high.
Town is located in the coastal areas of Laizhou earth wind generators farm wind turbines were installed 39 units, with a total installed capacity of 48.5 megawatts. Period of good wind for safe operation and protection work, struggling to minimize power outages, many wind power generation, to ensure the quality of wind power generation. Laizhou Wind Farm to break the previous run maintenance mode to protect the safety of electrical equipment and personnel under the premise of taking 24-hour reset the fan blower to reduce downtime as much as possible, so that power loss to a minimum. Winter favorable wind resources, wind farms to create the conditions for the overall operation. From November 2 to November 8, Yantai and Laizhou Dongyuan Wind generators Power Group, 19-turbine wind farm within a week completed a total of 2.52846 million kwh electricity, the highest since the weeks of the commissioning of new generating capacity is high; November 9days to complete generating capacity of 997.26 thousand kwh, the highest daily production capacity has been high. As of the end of October, Laizhou completed a total generating capacity of wind farms 5938.868 kwh.